Hydroelectric Development Options in El Dorado County
Table of Contents Executive Summary
Chapter 1. Introduction
Chapter 2. Energy Policies Supporting Hydroelectric Generation
Chapter 3. Water and Wastewater Energy Management Goals and Objectives for EDC
Chapter 4. Study Approach and Process to Develop Plan
Chapter 5. Inventory of County Hydroelectric Potential
Chapter 6. Preliminary Project Analyses of the Highest Ranked Hydro Options
Chapter 7. Detailed Project Analyses of “Top 10” Hydro Options (3.4 MB)
Chapter 8. Projects Warranting Additional Detailed Feasibility Analyses
Chapter 9. Recommendations and Next Steps
Chapter 10. Study Participants and Meetings Held
Chapter 11. Acronyms and Other Terms Chapter 12. References Appendix Table of Contents
Appendix A. Project-Specific Cost Estimates and Technology and Design Considerations
Appendix B. Hydrologic, Energy, and Economic/Financial Analyses and Assumptions
Appendix C. Environmental Regulatory Permitting and Feed-In Tariff RPS Certification
Appendix D. Feed-In Tariff program (1.3 MB)
Appendix E. Selected Legislation and Regulatory Mandates
Jenkinson Lake